K-12
   
McArthur Elementary Bathroom Renovations
McArthur elementary school at Galena Park is a 60+ year old building. The restroom renovation involved the tear down of all the old fixtures in the men and women’s restroom. Removal of all of the old plumbing lines and incorporating new sewer and water lines. We tore down the interior walls and rebuild them out of CMU. Then we tiled the walls and floor, incorporated new urinals and toilettes. Finally,  we installed the new toilette partitions and all of the new plumbing fixtures. Also on the janitor’s closet, we covered all of the walls with new FRP panels and installed a new mop sink with a water heater. New mirrors and accessories were also installed.
Project Value: 

   
Nimitz High School Welding Shop (In Progress)


Project Value: $545,934.65

Eisenhower Senior High School (In Progress)


Aldine ISD Modular Building Move and Relocation

Project Value: $1.7M

Renovations at Smith Stadium

P2MG provided design and construction services for the renovation of the drainage and underground utilities at William Smith Stadium. Included new concrete paving.

Value: $276,925.54

De Santiago Early Childhood/ Pre-K and Head Start Driveway Design/Build

P2MG provided design/build services for the construction of two new concrete driveways. Project included the removal of several trees and landscape work.

Value: $87,698.00

   
Port Houston Elementary Spark Park

Construction of outdoor classroom and associated connecting paver clad walkways. The addition of new entry columns with the school's mascot on top and the addition of a concrete seat wall.

Value: $96,980.00

Waltrip High School Renovations

P2MG worked with Satterfield & Pontikes Construction to provide construction management services and monitor certified payroll for all subcontractors.

Value: $395,608.00

Herrera Elementary School Life Safety

P2MG provided life safety upgrade.

Value: $14,338.00

Blackshear Elementary School Parking Lot Addition

P2MG demoed existing walkway and playground area. We provided surveying services to design new parking area, and performed the construction.

Value: $251,867.00

Attucks Middle School Painting and Chalkboard Upgrade

P2MG removed all existing chalk and marker boards, painted all walls, and installed new marker boards. We replaced all burnt out lighing, ceiling tiles, and exterior doors at T-Building.

Value: $255,287.00

Attucks Middle School Gym Floor Upgrade

P2MG removed the existing gym floor and basketball rims. We prepped and cleaned the area nad installed new gym floors and basketball rims.

Value: $104,702.00

Attucks Middle School Library Bookshelf Upgrade

P2MG removed existing bookshelves and installed new seven foot partition walls to make three additional work areas and mounted existing bookshelves on new walls.

Value: $42,820.00

Jones Parking Lot Addition

P2MG provided the Site Survey of the existing parking lot area, and the Civil Design for the new parking lot.

Excavate, Install light poles, and parking lot striping

Value: $1,170,675.47

Jones High School Culinary Arts New Admin Area Upgrade

P2MG installed a new exterior door, new flooring, ceiling tile, lights, and plumbing in the culinary arts room. Installed a chase wall between the buildings, and upgraded the walls, doors, painting, and ceiling tles in the administration area.

Value: $381,759.00

Jones High School Welding HVACR Cosmetology Area Upgrade

P2MG installed 3 new exterior door, new flooring, ceiling tile, lights, and plumbing in the cosmetology area. Upgraded the walls, doors, painting, and ceiling tles in the welding/HVACR area.

Value: $481,061.00

Jones High School Painting and Lighting Upgrade

P2MG removed all existing paint and repainted entire school and exterior canopy. P2MG replaced all waterfountains, blinds, and burnt out lighting, as well as installed new ADA compliant sinks and faucets.

Value: $484,475.00

Jones High School Partition and Bus Lane Upgrade

P2MG removed all existing restroom partitions and mirrors and replaced with new ones. We installed new bollards and re-striped the bus lane.

Value: $139,959.00

Shadowbriar Elementary School Site Drainage

P2MG provided surveying and construction services to upgrade drainage area around the school playground. Provided new underground drainage system and paved new sidewalks.

Value: $98,641.00

 
Elrod Elementary School Storm Drain Repair

P2MG demoed existing gutters and redesigned new drainage system. An underground drainage system and new rooof gutter system was installed to control waterflow and flooding issues.

Value: $379,681.00

 
Stevens Elementary School Parking Lot Addition

P2MG provided the design and construction of additional parking lot at front of school.

Value: $499,000.00

Hartman Middle School Interior/Exterior Improvements

P2MG installed card readers at all entry doors and master monitoring station in principal's office.

Value: $83,142.00

Jackson Middle School Video Surveillance Modification

P2MG upgraded the video surveillance system at the school.

Value: $53,640.00

Hattie Mae White Conference Room Wall

P2MG provided all labor and materials to construct new conference room wall.

Value: $7,500.00

Dogan Elementary School Interior Modifications

P2MG provided the demolition and installation of new stair tread, casework and shelving, door stops, ceiling tiles, soap dispensers, recess defibrillators, drinking fountains, and handrails. Also included the re-laminating of countertops and painting.

Value: $207,887.00

Dogan Elementary School Cove Base Installation

P2MG installed new cove base throughout school

Value: $21,250.00

Dogan Elementary School Signage

P2MG installed 130 new door signs.

Value: $24,420.00

 
Mark Anthony Wilkins Pavilion Parking Lot Improvement

P2MG provided surveying and design for new parking lot. The existing asphalt and concrete was then demolished and new parking lot was paved.

Value: $275,992.00

Crockett Elementary School Emergency Unit Ventilation Work

P2MG checked the operations and building equipment that involves the cooling, heating, and fresh air intakes. P2MG then fixed any problems with the ventilation unit as needed.

Value: $15,025.00

Crockett Elementary School AC Repair

P2MG provided control modules for the chillers, boilers, unit ventilators, and building exhaust fans.

Value: $223,297.00

 
Long Academy Fume Hood Installation

P2MG installed new fume hood, casework, ductwork, exhaust fan, flashing, and electrical work.

Value: $41,514.39

Shadydale Elementary School Marker Board Replacement

P2MG installed new marker boards in all of the classrooms at the elementary school.

Value: $26,242.00

Shadydale Elementary School Partition Replacement

P2MG demoed and installed 26 new partition walls in all the restrooms.

Value: $46,071.00

Shadydale Elementary School Tack Strip Installation

P2MG installed special ordered tack strips throughout the school.

Value: $9,215.59

Shadydale Elementary School Security Vestibule

P2MG relocated existing security camera and lighting and installed new glass store front to match existing building entrance way.

Value: $84,731.00

A.G. Hilliard Elementary School Marker Board Replacement

P2MG installed new marker boards in all of the classrooms at the elementary school.

Value: $30,990.00
 
A.G. Hilliard Elementary School Partition Replacement


P2MG demoed and installed 33 new partition walls in all the restrooms.

Value: $54,523.00

A.G. Hilliard Elementary School Tack Strip Installation

P2MG installed special ordered tack strips throughout the school.

Value: $9,215.00

B.C. Elmore Middle School Marker Board Replacement

P2MG installed new marker boards in all of the classrooms at the middle school.

Value: $36,415.83

B.C. Elmore Middle School Partition Replacement

P2MG demoed and installed 41 new partition walls in all the restrooms.

Value: $70,271.00

B.C. Elmore Middle School Office Build-Out

P2MG constructed 46 LF of new walls, 3 new fire rated doors, painting of new walls, and electrical.

Value: $62,155.0

B.C. Elmore Middle School Tack Strip Installation

P2MG installed special ordered tack strips throughout the school.

Value: $9,215.59

B.C. Elmore Middle School Store Front Addition

P2MG designed and installed new glass storefront at main entrance.

Value: $76,258.00

 
Forest Brook Middle School Chalkboard Replacement

P2MG installed over 50 marker boards at Forest Brook Middle School.

Value: $41,163.46

Forest Brook Middle School Partition Replacement

P2MG demoed and installed 48 new partition walls in all the restrooms.

Value: $91,709.00

Forest Brook Middle School Tack Strip Installation

P2MG installed special ordered tack strips throughout the school.

Value: $9,215.59

Forest Brook Middle School Life Safety

P2MG upgraded the electrical, plumbing, emergency exits, and mechanical systems.

Value: $118,752.00

Forest Brook Middle School Parking Lot Addition

P2MG demoed existing walkway and provided surveying services to design and construct new parking area.

Value: $420,633.00

Thurgood Marshall Elementary School Chalkboard Replacement

P2MG provided and installed 50 new 4x8 coark boards throughout the school.

Value: $49,980.46

Thurgood Marshall Elementary School Partition Replacement

P2MG demoed and installed 60 new partition walls in all the restrooms.

Value: $56,919.00

Thurgood Marshall Elementary School Parking Lot Addition

P2MG designed and constructed new driveway and faculty parking lot. Included the installation of new light poles.

Value: $409,436.63

Thurgood Marshall Elementary School Tack Strip Installation

P2MG installed special ordered tack strips throughout the school.

Value: $9,215.59

North Forest High School Partition Replacement

P2MG demoed and installed over 60 new partitions and urinals in all of the men's and women's restrooms.

Value: $122,363.00

North Forest Hich School Marker Board Replacement

P2MG replaced 73 marker boards in all of the class rooms.

Value: $59,475.71

North Forest High School Tack Strip Installation

P2MG installed special ordered tack strips throughout the school.

Value: $31,942.00

 
Fonwood Elementary School Interior Renovations

P2MG performed three task orders for the interior renovations of Fonwwod Elementary school as it was being converted from North Forest ISD to Houston ISD.

Task Order one was the installation of new dry erase and marker boards in over 100 classrooms.

Task Order two was the replacement of all of the doors in the school and construction of new partition walls.

Task Order three consisted of upgrading all restrooms to ADA requirements. This included new tile work, VCT flooring, new partitions, plumbing, and electrical.

Combined Value: $385,417.00

Spark Park at McReynolds Middle School

P2MG installed 1,300 lf of concrete sidewalk, 5 concrete pads and furnished ornamental park benches. We also installed manholes and piping as well as added a detention pond.

Value: $67,025.00

HISD Bond Program – Program Management Service

P2MG is worked with Rice and Gardner to manage 29 renovations on HISD’s west region and 64 safety and security projects, JOC Management, Scheduling, Estimating Services, and Training.

Value: $116 million.

 
HISD Life Safety JOC Contract

P2MG served as a Subcontractor to Jamial Construction to managed multiple life-safety projects throughout the district. Some of the challenges were completing the projects with children on campus. We met the triple constraint (time, cost, quality) on all projects.

Project Value: $1.5 million

DC Public Schools
   
Bell Lincoln MS & HS

Bell Lincoln Multicultural Middle and High School – D.C. Public School, HCC Project, PM This was a combined middle school, high school and community center total demolition and new construction project. The total square footage was approximately 300K Sq.Ft.

Project Value = $50 million

Miner Elementary School

Miner Elementary School – D.C. Public School, HCC Project, PM Project was 80K Sq.Ft. which included removal of existing underground storage tank while existing school remained occupied.

Project Value = $16 million

Noyce Elementary School

Noyce Elementary School – D.C. Public School, HCC Project, PM Renovation of existing school and addition of new classroom wing and auditorium.

Project Value = $11 million

Anacostia Stadium

Anacostia Football Stadium – D.C. Public School, HCC Project, PM Demolition and construction of field, track and bleachers.

Project Value = $3 million

Key Elementary School

Key Elementary School – DC Public School, USACE Project, PM Project consisted of constructing new classrooms and Gym. Phase two to renovate an existing building. All work completed with the constraint of existing school in session. Also included asbestos and lead abatement.

Project Value $15M

   
La Porte Head Start Renovation

Renovation project for HCDE to one of their Head start facilities due to damage from Hurricane Ike.

Project consisted of the upgrade of restrooms to meet ADA requirements, new lighting to match existing, new computer drops and duplex outlets, New reception office, paint exterior and interior, replace condenser units, replace disconnects, and electrical utility poles.

Value: $107,045.04