P2MG performed full floor renovation of the 5th floor at Kelly Hall. Renovations included drywall, ceiling tiles, tile work, vct, carpet, painting, electrical, and plumbing. The project also included renovations of the exterior stairwells.
Project Value: $2,300,788.00
Photos Coming Soon...
West Warehouse Waterline (In Progress)
8" PVC C900 CR14 pipe
Project Value: $$176,392.16
FCS Service Pathway
Install pervious paver pathway for a path from Academy Street to transformer area next to FCS Building. Pathway to use Eco-Priora permeable pavers in Herringbone patter. Built retaining wall using HIghland block units in area where the landscape needs to be shaped severely.
Project Value: $165,418.24
Hall Lobby-DHRL Facilities Project for CJ Hall
Interior renovation and repairs: demolition, drywall, paiting and millwork.
Project Value: $14, 304
Self Contained Compactor Pad
P2MG furnished design services for the design of a trash compactor pad at the Den.
Project Value: $28,065.00
SGA Panther Statue Design Phase I & II
P2MG commissioned a sculpture to design a life-size bronze panther which we placed infront of the Willie Albert Tempton Student Center.
Project Value: $69,375
Construction time: May 2011 - Aug 2011
Transportation Services New Wall
P2MG managed the construction of a new interior wall at the Trasnportation Center. Project included drywall, painting, new carpeting, and ceiling tiles and grids.
Project Value: $14,250
Construction time: Jan 2011 - Feb 2011
Projector Installation at Brewer, O'Bannion, and WR Banks
P2MG managed the installation of projectors and screens in Room 107 of the Brewer Building, Room 320 of the O'Bannion Building, and Room 204 of the WR Banks Building.
Project Value: $17,088
Construction time: Aug 2010 - Sep 2010
Hilliard Hall Interior Renovations
P2MG managed the interior renovations including renovations to multiple classrooms, painting, flooring and VCT replacement, new sheetrock, ceiling tiles, carpeting, and painting.
Project Value: $41,187
Construction time: June 2010 - Aug 2010
Gilchrist Building Renovations
P2MG managed the einterior renovations of mutiple rooms in the building. Renovations included the painting of room 140, re-glue of tape down approximately 4,000 square yards of carpet on the 2nd floor, paint the floors in rooms 137, 137A, 137C, 142A, 109D, 109E, and 109J and adjacent hallways.
Project Value: $25,793.00
Construction time: June 2010 - Nov 2010
Building Washing
P2MG managed the painting of all the walls in the hallways on all four floors plus the westwing.
Project Value: $48,988.00
Construction time: July 2010 - Aug 2010
NW Center Library Storefront
P2MG managed the construction of new glass storefront, drywall, painting, and tilework at the entrance of the library.
Project Value: $55,374.00
Construction time: May 2010 - June 2010
Building Washing
P2MG managed the exterior cleaning of several buildings on the Prairie View A&M main campus and at the College of Nursing in downtown Houston. A soft solution was used to clean the exterior of the building and remove all dirt and debris.
buildings include: College of Nursing Billy Nicks W.R. Banks Kennedy Architecture Building Evans Hall A.I. Thomas Administrative Building Leroy Moore Instructional Gym
Project Value: $79,296
Construction time: June 2011 - Oct 2011
Misc. Interior Renovations
P2MG has performed interior renovations of several buildings on the Prairie View A&M University campus. These renovations include the demo and construction of walls, painting, carpeting, ceiling grids and tiles, and the installation of glass storefronts.
Some of the locations include: CL Wilson College of Nursing Don Clark Delco Building Kennedy Architecture Building Hobart Taylor Theater Gilchrist Chapel Billy Nicks
Project Value: $
Construction time: Dec 2010 - Jan 2013
Blue Phone Upgrade
P2MG designed and layed out the infrastructure to support the installation of a new Code Blue speaker phone system. This included the installation of 25 Code Blue Phones with strobe lights throughout the campus, and the installation of 7 PAS speaker phone systems.
Project Value: $233,674
Construction time: April 2010 - Jan 2011
Campus Road Repair
P2MG was the general contractor for the rehabilitation of over 1.5 miles of roads on hte camous of Prairie View A&M University. The project consisted of demolition, concrete, intersections, paving, ADA compliant ramps, and parking lot upgrades.
Project Value: $1,435,331
Construction time: April 2009 - Dec 2010
Campus Wide Tree Pruning
P2MG managed the campus wide maintenance the campus wide tree maitenance project which consisted of tree preservation, pruning, and removal of trees that were considered hazardous (over 200 trees) across the campus.
Project Value: $130,247
Construction time: April 2011 - Dec 2011
Golf Cart Storage Area
P2MG provided Design/Build services for the construction of a new covered parking area for the Prairie View A&M University golf carts. P2MG erected a metal covered area with electrical and battery storage locations to support golf cart hook-ups..
Project Value: $115,008
Construction time: April 2011 - Dec 2011
College of Nursing
P2MG managed the construction of the lab remodel, managed and constructed the interior renovations for mutliple floors of the college while not interupting the school schedule. Work included the demo and reconstruction of walls, painting, and flooring.
Project Value: $45,000
Construction time: Sep 2011 - Nov 2011
Hobart Taylor Theatrical Lighting and Sound
P2MG provided Design/Build services for tthis 3 phase project. Phase I included providing general electric service throughout the theater area. Phase II included upgrading the theatrical lighting and sound equipment Phase II included upgrading all dressing rooms and restrooms throughout the theater area to meet new ADA compliance codes.
Project Value: $507,000
Construction time: April 2011 - Dec 2011
Park Renovation
P2MG managed and constructed a new park located on the Prairie View A&M University main campus. Existing old building site, prepped site for construction, surveyed area, layed out new park, added four radial circles with two trellis systems, attached by concrete sidewalks with gravel finishing, with over 200 lf of seat walls throughout Park.
Project Value: $619,691
Construction time: April 2011 - Dec 2011
A.N. Poindexter Vet Holding Pen
P2MG provided Design/Build services for the management and construction of new Holding Pens. Graded new area, tapped existing waterline, crossed existing gas line (sleeved gas line), added new concrete pad and erected a metal building structure.
Project Value: $228,750
Construction time: July 2011 - Jan 2012
Central Receiving Warehouse Addition
P2MG provided Design/ Build services for the 12,000 sqft build out of a 6,000 sqft building with a 6,000 sqft covered parking area attached to the building. We demolished existing parking lot and prepped the site for the new buiding. Placed slab, erected metal framing, placed CMU blocking around framing with a brick facing. Upgraded new and existing building restrooms and parking to meet new ADA codes.
Project Value: $500,000.00
Poultry Lab & Shower Remodel
P2MG provided Design/ Build services for the upgrade of over 2,500 sq ft of the existing lab. Renovations included upgrading all restrooms and parking lots to ADA requirements, as well as painting , ceiling tile replacement and VCT flooring in the hallways, and new cabinets in the labs.
Project Value: $250,000.00
Evans Library Roof Repair
P2MG performed as COnstruction Manager for the removal of three courses of brick, installation of new flashing and installation of new brick once flashing is installed.
Project Value: $138,562.00
Medical Science Library Renovations
P2MG managed the Interior renovations to the library including the interior wall construction, painting, terrazzo floor work , ceiling tile replacement, electrical work (ceiling relocation & wall receptacle), electrical power receptacles and light switch relocations, and the modification of the interior room ceilings (both inside and outside the new area enclosures).
Project Value: $547,765.00
Richardson 9th Floor Refurbishment
P2MG managed the patching, prepping and painting of the 9th floor as well as the replacement of all damaged and stained ceiling tiles, refinishing of doors and the removal andreplacement of two emergency showers.
Project Value: $24,214.00
Riverside Campus Main Gate Renovation
P2MG provided construction services for the removal and disposal of two existing sliding gates at the main entrance to the Riverside Campus. Replaced with two new aluminum sliding gates complete with heavy duty rollers.
Project Value: $13,254.00
Zachry Building Room 103
P2MG performed construction management services to build up a new teaching platform with built-in ramp, remove existing sliding marker board system, install new marker boards, provide new paint and ceiling finishes, and make new electrical and data runs for new furniture.
Project Value: $11,737.00
Reynolds Medical Building Chiller Piping Project
P2MG managed the removal and replacement of the chilled water supply and return piping in the mechanical roon #334 of the Reynolds Medical Building.
Project Value: $18,748.00
Civil Engineering Lobby Hall
P2MG managed the removal of existing trophy case in the lobby, replaced ceiling grid and tiles throughout first floor hallway and lobby, installed new can lights, and re-stained wood doors forthe stairwellss, restrooms and front entry.
Project Value: $25,899.00
McNew Building Painting
P2MG installed epoxy flooring, epoxy curbs around fume hoods, as well as patched and painted walls in room 206 and 204.
Project Value: $29,246.00
McNew Waterproofing
Managed the urethane injection of the walls of the McNew Building and the repair of spalled concrete columns.
Project Value: $10,752.00
West Campus Tennis Building Brick Restoration & Wall Repair
P2MG provided construction services to repair cracks in 30 linear feet of cinder block wall and 45 linear feet of sheetrock. Project included painting of exterior and interior walls.
Project Value: $7,361.00
CEL Wave & Towing Tank
P2MG managed the injection of urethane grout to repair cracks in the CEL Wave pool.
Project Value: $26,803.00
Penberthy Baseball Field
Project Value: $
Chemistry Lab Building 486 Renovations
P2MG removed all existing lab chairs and replaced with new ones. Project also consisted of painting all the walls of the lab.
Project Value: $37,555.00
CE TTI Building Renovations
P2MG provided construction management services for the painting of all of the corridor walls on the 2nd, 3rd, 5th and 7th floors including all elevator doors.
Project Value: $18,600.00
Scoates Biology Lab Concrete
P2MG provided design/ build services for the demolition and renovation of 709 sqft of the interior concrete floor. Includes 6" concrete slab, new VCT and repainting the walls.
Project Value: $35,812.00
Architecture Building C Roofing Project
P2MG removed one inch of existing roof, primed all surfaces and applied 2 inches of polyurethane foam and silicone coating with sand.
Project Value: $121,734.00
Military Sciences Roofing Project
P2MG removed existing roofing materials and through wall metals. All surfaces were primed before 2 inches of polyurethane foam and silicone coating with sand were applied.
Project Value: $123,876.00
Cain Hall C-Wing First Floor Renovations
P2MG removed and disposed of existing divider wall between C-103 and C-104, ceiling tiles, and doors. We constructed new walls, installed new fire alarms, sprinklers, and painted new walls.
Project Value: $9,402.00
Roy G. Cullen Suite 116 Renovations
P2MG provided construction services for the renovation of Suite 116 in the Roy G. Cullen Building. Renovations included, electrical, plumbing, drywall, VCT, carpet, painting, new doors, HVAC repairs, and new fire alarms.
Project Value: $93,100.00
MD Anderson Vocal Booth
P2MG performed the interior renovations at the MD Anderson Library for the installation of a new vocal booth. The project consisted of the installation of the mechanical, electrical, and data connections. Also included new walls, ceiling grids, frosted glass doors, and paint.
Project Value: $26,484.00
Farish Hall Restroom Renovations Level 1&2
P2MG performed construction services for the compete renovations of all the restrooms on level 1 & 2 of Farish Hall. The project encompassed demolition and installation of new wall tiles, electrical fixtures, drywall repair, new VCT, new toilet partitions, toilets, sinks, mirrors, and plumbing.
Project Value: $215,000.00
Pillar and Asphalt Rectification
P2MG provided construction services for emergency asphalt and pillar repair. The work included the demolition, removal and disposal of damaged pavement. We straightened and re-chored the damaged pillar and installed new black top pavement around the pillar to pre-event conditions.
Project Value: $4,491.00
Cameron Building Renovations
P2MG was responsible for furnishing and installing new carpet and base in classrooms 103 and 105 in the Cameron Building #586.
Project Value: $7,614.00
Wortham Theatre Floor Replacement
P2MG removed the existing flooring and installed a new flooring system in the Wortham Theatre Scene Shop. Services included the installation of 3/4" BC grade plywood on 2"x4" moisture treated sleepers.
Project Value: $28,342.00
Ezekiel Cullen Room 501 Renovations
P2MG provided the renovation of mutiple offices. The scope of work included moving walls to expand a storage room into an office and the relocation of walls to make new offices. New doors, electrical and HVAC were also required.
Project Value: $27,753.00
Billboard Replacement
P2MG provided design and construction services for the replacement of a billboard at ERP Bldg 19.
Project Value: $66,000.00
Power Washing of Health Science Center
P2MG provided construction services to power wash the metal and wash all the windows at the UH Health Science Center. Scope included cleaning mineral deposits on the windows and polishing the window panes at the main entrance to enhance the appearance of the entryway.
Project Value: $20,452.00
Science and Research Restroom Renovations
P2MG was responsible for the renovation of 16 restrooms, elevator floors & upgrading TV/display areas features in the lobby area renovation of 16 restrooms, the project encompassed demolition of existing wall tiles, new electrical fixtures, drywall repair, new VCT in the elevators, new toilet partitions, and plumbing.
Project Value: $375,000.00
College of Optometry Air Flow Survey
P2MG provided construction services to conduct air flow surveys in the animal holding areas of the J. Armistead Bldg. and the TMC Bldg. Surveys included measuring all supply and return air flow in all animal holding rooms. This included calculating the air changes per hour rate and the associated pressure differential between the hallways and the animal holding rooms.
Project Value: $23,782.00
CRWC Signage
P2MG provided and installed aluminum letters and signage and installed all electrical work from new signage to existing circuits.
Value: $9,250.00
Sawyer Auditorium Door Replacement
P2MG replaced the interior doors & hardware on Auditorium Entrances (First Floor Openings) in the East & West side stairway pairs on 1st & 2nd floor. We also replaced the second floor Auditorium entrance doors, second floor mens restroom door, third floor East & West stairway entrances, third floor two balcony single entrance doors, doors at the stage on the East & West sides, the East side stage exterior exit, and painting.
Project Value: $73,624.00
Jesse Jones Exterior Door Replacement
P2MG installed new exterior doors and kickplates to match existing storefront.
Project Value: $50,313.00
Renovate 5 Classrooms in HPE Building
P2MG renovated five classrooms in the Health and Physical Education building. the renovations included drywall, ceiling tiles, and painting.
Project Value: $18,000.00
Entry Gate at Tierwester and Wheeler
P2MG provided Design/ Build services for the entry gates at both ends of the campus. Included the installation of new bronze plaques and metal archway.
Project Value: $52,345
Rollins Stewart Classroom Renovations
P2MG Renovated multiple classrooms and lockers. The project included the construction and installation of new cabinets, drywall, painting, and ceilings.
Project value: $99,638
West End Garage Office Renovation
P2MG Renovated the offices at the campus police station. Work included demo and construction of new carpet, drywall, and painting.
Project Value: $17,587.00
Full 7th Floor Renovation
P2MG managed a full floor renovation of the 7th floor in the Main Street Campus. Included demo of existing walls, construction of new walls, carpeting, painting, ceiling grids, and construction of controlled environment room for network.
Project Value: $83,000
HUB Program Manager for 2008 Bond Program
P2MG performed as the Hub Program manager for the 2008 Bond Program over eight campuses, multiple construction projects from architectural design through complete construction.